Tunisia–Finland Green Energy Bridge · Vision 2026–2045

Build the first project. Prove the platform.

A proposed 10 MWp solar PV project in El Faouar, Kébili, Southern Tunisia. Seeking experienced co-developers and development-capital partners to advance land, grid and feasibility work.

Project ZeroFirst proposed development project
SPVProject-specific approvals
2026–2045Long-term vision horizon

Project Zero in numbers

10 MWp

Proposed solar PV capacity

Design target

≈ 18

Indicative annual generation · GWh/year

Preliminary screening estimate

25–30

Required land area · hectares

Land rights not secured

1,797

GSA specific PV output · kWh/kWp/year

Modelled resource baseline

1,977.7

GSA horizontal irradiation · kWh/m²/year

Modelled resource baseline

These figures describe a proposed project. No land rights, grid allocation, authorisation, signed PPA or financing commitment are secured. Target pathway: authorisation regime, subject to applicable conditions and approvals. Intended electricity buyer: STEG.

View assumptions and project status

Source: supplied Global Solar Atlas report, generated 30 September 2026, for an indicative study point. 10,000 kWp × 1,797 kWh/kWp/year = 17.97 GWh/year, rounded to about 18. This is not a P50/P90 assessment or guaranteed grid export. Independent assessment is required. Land area: founder’s project request.

Global Solar Atlas ↗

Updated 21 October 2026

From El Faouar, we begin

Project Zero and our wider vision

English narration · Arabic subtitles · 3:45

Download the video

The company platform

From lived experience to a vision for a better future

Mokhtar Benothman, a native of El Faouar in south-western Tunisia now based in Finland, launched the Blue Green Energy Bridge initiative out of his attachment to his homeland and his own experience of intense summer heat and frequent power and water cuts, and their impact on daily life in the community.

From that experience grew the Tunisia–Finland Green Energy Bridge Vision 2026–2045: connecting local knowledge with expertise, technology and investment to help develop practical clean-energy solutions and open opportunities for training and local development in southern Tunisia.

Project Zero, a proposed 10 MWp solar PV project in El Faouar, Kébili, is the starting point of this vision: developing clean electricity generation intended for sale to Tunisia’s national grid through STEG. We invite development, technology and investment partners to help turn this vision into projects ready for implementation, step by step.

From El Faouar, we begin. Together, for our children's future.

Explore Project Zero and partnership opportunities →
Legal status

Company name reserved with Tunisia’s RNE. SARL incorporation in progress.

01

Blue Green Energy Bridge

Company and project-development platform.

02

Tunisia–Finland Vision

The 2026–2045 strategic direction.

03

Project Zero Tunisia

The proposed first development project.

Conceptual illustration of a phased solar development vision in southern Tunisia
Conceptual illustration only — not a confirmed site, capacity, grid connection or export route.

First development project · proposed

Project Zero Tunisia

10MWp solar PV proposed

A founder-originated solar opportunity with local administrative engagement and a preliminary solar-resource baseline. The next investment case will be built around a confirmed parcel, a STEG connection study and independent feasibility.

Indicative area
El Faouar, Kébili · Southern Tunisia
Current scope
Preliminary technical and economic studies; independent validation to follow
Immediate priorities
Land pathway, grid assessment, authorisation route and bankable feasibility
Decision rule
No scale-up before the required evidence gates are cleared
The final site and all land rights remain subject to legal, technical and environmental verification. No land right, grid allocation, permit, PPA, financing, EPC appointment or construction decision is claimed.

A preliminary resource baseline

1,977.7

Global horizontal irradiation · kWh/m²/year

1,797

Specific modelled PV output · kWh/kWp/year

≈ 18

Indicative annual generation for 10 MWp · GWh

Source: supplied Global Solar Atlas report, generated 30 September 2026 (World Bank / Solargis), for an indicative study point in the target area. Ground-mounted system, 1,000 kWp, south-facing, 35° tilt. Output of 1.797 GWh/year scales arithmetically to about 17.97 GWh/year for 10 MWp. This is screening information, not a P50/P90 study or a guaranteed grid export. Final design, soiling, availability and grid constraints require independent assessment.

Global Solar Atlas · World Bank / Solargis

Preliminary feasibility · October 2026

Technical and economic preliminary studies are available. Project Zero remains in development; independent validation and project-specific approvals are the next steps.

Indicative annual energy

Two preliminary screening estimates are available: about 18 GWh/year from Global Solar Atlas scaling and about 16.1 GWh/year of grid sales from a HOMER model. They rely on different assumptions and boundaries, which have not yet been reconciled. Neither is a guaranteed or probability-based yield; an independent yield assessment will establish the reference figure.

Current development status

Land rights, a STEG connection study, authorisations and financing remain to be secured. The study point is a climate reference, not a confirmed project parcel.

What makes the project investable

The preliminary work identifies a clear route to strengthen the investment case: competitive EPC procurement, a confirmed grid solution and financing matched to project revenues. These conditions will be tested through supplier offers and independent review before an investment decision.

Partners sought

Experienced co-developers and development-capital partners to advance land rights, independent studies, grid assessment and authorisations through agreed milestones.

Updated 6 October 2026. Based on the supplied preliminary technical and economic reports, Global Solar Atlas and a separate annual financial screening model. No new HOMER simulation or independent engineering certification is claimed.

Project Zero — Development Roadmap

Indicative roadmap, not completed milestones. Workstreams can overlap; progression depends on evidence and approvals.

Land rights, grid connection, authorization, PPA and financing are not yet secured. Storage remains subject to feasibility.

  1. Project definition

    • Confirm 10 MWp scope
    • Define objectives and assumptions
    • Identify required evidence
  2. Land and site control

    • Verify title, access and boundaries
    • Secure suitable site documentation
    • Confirm land approval pathway
  3. Partners and development rights

    • Verify technical references
    • Agree consortium roles and rights
    • Define equity and funding obligations
  4. Grid and technical studies

    • Obtain STEG preliminary study
    • Prepare layout and yield assessment
    • Estimate connection costs
  5. Environment and stakeholders

    • Environmental screening
    • Agricultural non-objection
    • Local stakeholder consultation
  6. Preliminary financial case

    • Validate CAPEX and OPEX
    • Test tariff, debt service and FX risks
    • Seek bank financing agreement in principle
  7. Application and Ministry approval

    • Confirm window and required documents
    • Arrange bid security and submit
    • Obtain Ministry agreement in principle
  8. SPV and detailed development

    • Establish project company
    • Implement agreed rights and governance
    • Complete detailed studies and approvals
  9. PPA and financial close

    • Execute applicable PPA arrangements
    • Satisfy lender conditions
    • Complete financial close
  10. Procurement and notice to proceed

    • Finalize EPC and supply contracts
    • Confirm construction readiness
    • Issue notice to proceed
  11. Construction and commissioning

    • Build and supervise works
    • Test and obtain required approvals
    • Achieve commercial operation
  12. Operations and performance

    • Operate and maintain
    • Monitor yield and payments
    • Review performance and lessons

PPA and approval timing must follow applicable procedures. This roadmap complements the decision gates; it does not replace them.

Tunisia–Finland Vision 2026–2045

Read the long-term vision

Start with proof. Scale with discipline.

Project Zero is the proposed starting project, not the full platform ambition. Its purpose is to validate a development model capable of supporting larger stages. Progression occurs only where land, grid, authorisations, commercial structure and financing are confirmed.

01Proposed start
10 MWp

Project Zero

Proposed 10 MWp solar PV reference project. A storage option will be assessed within feasibility; no storage capacity or budget has been adopted.

02Conditional expansion
~50 MWp

First expansion

A larger development stage after the model and delivery structure are validated.

03Conditional portfolio
~200 MWp

Regional scale

Multiple opportunities advanced under separate site, grid, regulatory and investment decisions.

042045 ambition
400+ MWp

Platform ambition

Long-term ambition: solar, storage, renewable-powered water, green hydrogen and knowledge transfer. Each opportunity requires separate feasibility and financing.

Growth beyond Project Zero will follow the legal pathway and proven feasibility of each project: the authorization regime, self-generation for eligible consumers, partnership in public concession tenders, or joining existing projects. Each step is decided by the competent bodies of each project company, in line with Tunisian law and the contractual rights of all parties.

Claims discipline

All post-Project Zero capacity figures shown above are strategic ambitions, not an owned, permitted, contracted or financed pipeline. Each stage is conditional and may comprise one or more projects.

Project Zero: the path to construction

Seeking technology and investment partners · Proposed Centre of Excellence, Kébili

Project Zero · Proposed 10 MWp solar PV

Land rights, grid connection, authorisation, PPA and financing secured?

No

Pause, reassess or redesign

Reassess the conditions before proceeding
Yes

Construction and operation · Electricity sales to STEG

Conceptual Tunisia Finland energy bridge vision
Concept illustration of the long-term vision. Water and hydrogen are future options; no physical bridge, export route or institutional partnership is implied.

Development pillars and decision gates

Reference project: 10 MWp solar PV. A storage option will be assessed within the feasibility study; no storage capacity or budget has been adopted.

Storage assessment must identify the economic or contractual benefit that justifies its cost. If no sufficient benefit is demonstrated, storage will be excluded from the project scope.

Solar PV

Land-control instrument and STEG connection assessment for Project Zero. Confirmed regulatory pathway, independent yield and environmental studies, viable financial model.

BESS

Assess services, operating needs, losses and total storage cost. An evidenced revenue or contractual benefit that supports the investment; integration or separate SPV as appropriate.

AI and smart energy

Collect reliable production, weather, dust and maintenance data. Demonstrated improvement against a baseline; usable data and sustainable service economics.

Decarbonisation

Define an emissions baseline and measurement method. Independent verification where required; no carbon-credit income assumed before eligibility is established.

Water and desalination

Assess demand, water source, energy needs and brine management. Resource rights, permits, environmental acceptability, customer and viable water-service economics.

Green hydrogen and ammonia

Assess coastal locations, renewable electricity, sustainable water, buyers and logistics. Separate water budgets must protect household and oasis needs. Progress requires credible offtake, safety, certification, permits and competitive economics.

Each stage of the vision would be developed as a separate project, under the authorization regime or a concession procedure depending on its individual capacity and the applicable framework. Portfolio size does not determine the procedure; each project is assessed on its own.

Centre of Excellence for energy knowledge exchange

Our ambition is to help advance Tunisia’s energy sector and build a hub for knowledge exchange across Africa, the Arab world, the Mediterranean and Europe.

The proposed centre begins as an open framework for applied research, training and knowledge transfer. Its first proposed pilot measures dust, panel cleaning and water use for Project Zero, comparing practical cleaning methods before adopting AI. Local measurements will test the potential benefit; no savings are guaranteed.

The Centre of Excellence would seek cooperation with universities and research centres in Tunisia and Finland. No cooperation agreement exists at this stage.

An open invitation to contribute

Universities, research centres, companies and public institutions from all regions are welcome to propose or lead a study, a pilot or a training programme with BGEB. We welcome initiatives that demonstrate practical value for Tunisia and potential exchange across Africa, the Arab world, the Mediterranean and Europe.

Each collaboration will define its scope, funding, responsibilities, data access, intellectual property and publication rights in writing.

Propose a research or training initiative

Water: three regions, distinct needs

Kébili: groundwater protection, efficient oasis water use, reuse and suitable brackish-water treatment. Gabès and Médenine: coastal desalination and industrial water options. Each opportunity requires a permitted source, specified water quality, a paying customer, delivered-water economics and an acceptable brine solution. Desalination does not itself resolve groundwater depletion.

Decision architecture

De-risk first. Scale second.

Each stage must produce evidence strong enough for the next decision. Ambition follows readiness—not the other way around.

01

Land

A documented, legally viable and suitable site pathway.

02

Grid

Connection capacity, route, cost and timetable assessed.

03

Authorisation

The regulatory route mapped and approvals pursued in sequence.

04

Feasibility

Technical, environmental and commercial assumptions tested.

05

Bankability

Delivery structure, revenue logic and financing readiness aligned.

Governance · transparency · engineering discipline · local value

Who decides the pace?

The vision is indicative, not a fixed delivery schedule. Each project’s competent governing body decides whether to advance, hold, restructure or stop, considering technical advice and lead financiers’ contractual approval rights, under Tunisian law and in the project’s interest. The legal form, reserved decisions, BGEB’s role and rights will be defined in written agreements. Funding does not automatically confer control over BGEB or other projects.

Local value, measured in practice

The platform starts in El Faouar, a region of oases, dates and desert tourism, and aims for clean energy to support these local sectors.

We aim to strengthen economic vitality and social inclusion in southern and border regions through decent work, training, local businesses and efficient energy and water solutions. Kébili, Gabès and Médenine are priority areas for the water, hydrogen and ammonia vision. Benefits depend on viable projects and documented local delivery plans; a grid-connected solar plant does not by itself guarantee cheaper household electricity.

Indicators will distinguish construction job-years and peak headcount from permanent full-time jobs, and track training, local procurement, measured water savings and environmental performance. Targets will be set after project-specific studies; no employment or savings totals are promised.

Partnership and project structure

BGEB originates and coordinates the development of renewable-energy projects in Tunisia, working with qualified technical partners and investors to advance each opportunity from early site identification toward an investment decision and, ultimately, financial close. Project-specific roles, funding and participation are agreed transparently through dedicated contractual arrangements.

The platform and project companies

BGEB coordinates origination, local stakeholder dialogue, administrative pathways and qualified specialist contributions. A dedicated Tunisian project company (SPV) is proposed for each project that can support its own contracts and financing. A technology does not automatically require a separate company. The Centre of Excellence supports research and training; it does not automatically own or control the SPVs.

Investor entry and governance

Investors and developers may participate in the project matching their expertise. Contributions, valuation, equity, decision rights, budgets and milestones will be negotiated and documented. Project rights are distinct from rights over BGEB or its future pipeline. Development exclusivity should be limited in scope and time, with measurable obligations, termination rights and clear ownership of studies. Transactions between BGEB and SPVs require transparent pricing and appropriate approval.

Potential revenue model

Potential BGEB income includes milestone-based development fees, negotiated developer equity reflecting documented contributions and risk, and contracted services such as local coordination or monitoring. These are proposed commercial options, not acquired rights or guaranteed revenue. Services must be demonstrably useful and should avoid charging twice for the same contribution.

International cooperation

Develop the first project with us.

We welcome experienced renewable-energy developers, technical specialists and investors able to fund early development milestones. BGEB contributes project origination, local knowledge, community dialogue and administrative coordination. Cooperation terms will be negotiated for the specific project.

01Co-development · studies, permitting and delivery experience
02Engineering · solar yield, STEG connection and ESIA
03Development capital · staged budgets and measurable milestones
04Technology & research · storage, water and knowledge transfer

A project-specific partnership

Proposed structure: a dedicated Tunisian project company (SPV), with contributions, responsibilities, milestones and governance agreed in writing. Equity and financing terms remain open to negotiation; no partner rights are granted by this website.

The next deliverables

A written land-control instrument; STEG connection assessment; confirmation of the authorisation pathway; independent yield study and environmental scoping; a costed development plan and financial model.

Introduce your proposed role, relevant project references and the milestone you can help deliver.

Discuss Project Zero

Financing pathways to assess

BGEB and qualified investors may structure Tunisian project companies and explore commercial or development finance, directly or through local banks, and appropriate guarantees. Eligibility, borrower structure, costs and conditions are assessed separately. Exploratory dialogue is possible at the current stage with full disclosure. No financing or guarantee has been secured.

For authorised solar projects above 2 MW and up to 10 MW, the October 2024 tariff framework allows euro indexation matching documented foreign-currency financing, capped at 80%, subject to approval; monthly billing remains in TND. Expansion contracts may differ. Investment grants may require a reduced tariff. Screening models are internal tools, not verified returns or financing offers.

Events / Événements / فعاليات

Completed · 17–18 September 2026 Essen City Hall

First German–Tunisian Business Forum

Development dialogue

Discuss your role in Project Zero.

Contact the founder to discuss co-development, technical studies or development capital. Share your relevant project references and proposed contribution.

Blue Green Energy BridgeTunisia–Finland

Founder contact

Mokhtar Benothman

CEO & Founder

Save the current contact details directly. Display the QR only when another person is ready to scan it.